| Physic | ISOLDE Physics Schedule | Project CERN-0000224856 https://isolde.web.cern.ch/weekly-schedules Detailed schedule: https://cernbox.cern.ch/s/ck3wY5JYyZWiu5G This is kept up to date, so you can refer to it if you have questions about the plans beyond the weekly schedule sent out on Fridays. Overview schedule for quick reference: https://isolde.web.cern.ch/isolde-schedule-2025 Schedule on EDMS: https://edms.cern.ch/document/3289042/1 beam requests |
| 2024/11/25 Last protons to ISOLDE (338th IEFC meeting) 2024/12/09 Winter physics ends 2024/12/12 Lock in 2024/12/19 Water stopped 2025/01/11 Test Annuel Arrêts d’Urgence (AUG) MEYRIN ZONE PS/BOOSTER 2025/02/18 Start of Target, Low E and HIE ISOLDE HW Commissioning 2025/02/24 Water back to ISOLDE 2025/02/25 Rota starts: IMS1 & IMS2, NO stand-by service 2025/02/25-26 BTY line tests 2025/03/05 Start of Target and Low E Beam commissioning 2025/03/07 DSO test (edms 2681121/2025 ) ISOLDE Target – Beam Permit EDMS 1132631 to be approved before 2025/03/10 2025/03/07 DSO tests REX/HIE-ISOLDE – RF Permit EDMS 1686095 to be approved before 11/03/2025 Cooldown of the Cryo Modules HIE-ISOLDE – Beam Permit to be approved EDMS 1703483 before 21/04/2025 2024/03/18 Stand-by service starts 2025/03/21 First protons to ISOLDE (357th IEFC meeting) 20/03-24/03 24/03-28/03 24.03: Installation of SEMgrid target in the GPS front-end 26.03: Target ready for first protons 01.04: SEMgrid target removed from GPS front-end and installed in HRS front-end 02.04: SEMgrid target from HRS front-end 3rd or 4th of April MEDICIS tests gafchromic verify parameters used for direct irradiation 2025/03/28 Low energy physics starts 2025/04/22 (21?) Start of HIE-ISOLDE beam commissioning 2025/06/13 Physics start HIE-ISOLDE 2025/12/08 Last protons to ISOLDE (357th IEFC meeting) 2025/12/16 Stand-by service starts | |
| YETS2024-2025 (EDMS3074458) 25/11/24 – 07/03/25 | https://indico.cern.ch/event/1305334/ REX-HIE ISOLDE YETS 24/25 planning | Document 3182746 Isolde Target area/ Separator zones YETS planning EDMS 2961471 EN-EL tests https://edms.cern.ch/ui/file/3121856/1.0/Electrical_test_during_EYETS_2425_2024-10-01_pptx_cpdf.pdf ![]() |
| YETS2025-2026 | ![]() |
| Injectors Schedule | https://beams.web.cern.ch/accelerators-and-schedules https://cern.sharepoint.com/sites/Projects-Accelerator-Complex-Schedules/default.aspx Injectors: 2025: https://edms.cern.ch/document/3057281/0.1 [CERN-JIRA] (CPSSAFETY-136) Re: [2025 DSO test] ISOLDE – planning DSO tests planning DSO tests https://edms.cern.ch/document/2681121/2025 Injectors: 2024: https://edms.cern.ch/document/2872566/2.0 Injectors Schedule 2023 EDMS2785499, 2022 EDMS244555 2021 EDMS 2442568 and in indico 932569, 2018 EDMS1882670 archives 2017, 2016, 2015,.. |
| Long Term Schedule | Long Term Schedule for the CERN Accelerator Complex EDMS2311633 Accelerator Schedule Management ASM Accelerators Master Schedules CERN-0000205174 http://lhc-commissioning.web.cern.ch/ |
| Archives | LS2 Master Schedule https://edms.cern.ch/document/ACC-PM-MS-0002 |
| Injectors Schedule 2022 (Draft version) EDMS2664482, 2021 EDMS2442568, 2018 EDMS1882670, archives 2 | |
| 2021 Recommissioning plan with the detailed dates EDMS 2477307 | |
ISOLDE timelines | |